Low voltage. Operating theatres | OCA Global
Select country:

Spain

ES / CA / EN

Andorra

ES / EN / CA

Saudi Arabia

ES / EN / عر

Brasil

ES / EN / PO

Chile

ES / EN

Colombia

ES / EN

Egypt

ES / EN

Arab Emirates

ES / EN

India

ES / EN

Morocco

ES / EN / FR

Mexico

ES / EN

Panamá

ES / EN

Peru

ES / EN

Portugal

ES / EN / PO

Romania

RU / EN

South Africa

ES / EN

Ukraine

ES / EN

Italia

ES / EN

Electricity

Low voltage. Operating theatres

Electrical installations in buildings where operating theatres are located must have an electrical project designed and revised for their legalisation, and they are obliged to undergo the necessary periodic inspections since the entry into force of the Low Voltage Directive.

The inspections that must be carried our are divided into:

  • Initial inspections: those established before the installation starts functioning. They are valid for 5 years.
  • Periodic inspections: To be able to maintain the level of security already approved, these inspections should be carried our every 5 years.    

In the case of installations prior to the entry into force of the Low Voltage Directive, the inspection will be carried out according to the regulations under which it was approved, applying the stipulated inspection and validity periods. 

Applicable regulation

  • Royal Decree 842/2002
  • ITC-BT-05
  • ITC-BT-38
Low voltage. Operating theatres

Specific search

If you already know it, find it faster

Business lines